Description
The MECTRON Single Post Fully Hydraulic In-Ground Service Jack is a heavy-duty lifting solution designed for automobile service workshops, fleet maintenance facilities, and service centers. The system offers stable, smooth, and safe lifting of a wide range of vehicles, ensuring efficient underbody access for servicing and repairs.
Standard Equipment Included
-
Independent Intermediate Oil Reservoir (IOR)
-
Heavy-duty H-Type Beam
-
Control Valve for precise lifting height control
-
Single post hydraulic lifting cylinder assembly
-
Complete service jack mechanism
Key Features
-
High-grade steel plungers manufactured to close tolerances with hard chrome plating for superior wear resistance and long service life
-
Outer hydraulic cylinder coated with Fiber Reinforced Plastic (FRP) for enhanced corrosion protection
-
Uniquely designed wiper rings prevent ingress of water, dust, and dirt during lifting and lowering operations
-
Heavy-duty gland rings engineered for enhanced sealing performance and durability
-
Rigid, robust ramps designed to accommodate a wide range of vehicle sizes and weights
-
Smooth, stable, and controlled lifting operation suitable for continuous workshop use
Hydraulic Pipeline Works (Included)
-
MS SH 40 seamless hydraulic pipe – 1½”
-
High-pressure hydraulic fittings rated at 3000 PSI
-
Grease-coated protective tape for underground pipeline rust prevention
-
Complete hydraulic pipeline routing from hydraulic receiver tank to jack cylinder
Scope of Installation & Commissioning
-
Installation and commissioning will be carried out by MECTRON-authorized technical personnel
-
Complete hydraulic pipeline installation as per approved layout
-
Functional testing and operational handover after commissioning
Terms & Conditions – Installation & Commissioning
-
Installation and commissioning of the equipment will be carried out by our technical team
-
All civil works, including foundation, pit construction, grouting, and finishing, must be provided by the customer as per our drawings and technical requirements
-
All electrical works, power supply, and compressed air connections shall be arranged by the customer
-
Any government approvals, permits, or statutory clearances, if required, must be obtained by the customer prior to installation
-
Delays due to non-readiness of civil or electrical works will not be the responsibility of the supplier
- Installation and service are limited to UAE locations only.

